The week was from 2-6 July. In this week I printed out the Drainage plans and one of the drainage plans (Unit 5) was issued to site, which I had to deliver to site.
I started Electrical Layouts for the same units, indicating only sockets, exterior lights, alarm, intercom, internet, telephone line, etc. (basically everything that is installed through the floor or walls)